Make bottlenecks visible, compare scenarios.
- Starting point
- A production site that grew over decades is reaching its limits.
- What I did
- Process map, bottleneck analysis, layout scenarios and practical production aids.
Industry & Production
Buildings, machines and logistics are often planned separately. I bring them together: layout, material flow and ramp-up, seen from production, not from the floor plan.
Smaller first packages often start the next day
Your route
New plant, new logistics centre, relocation during live operation: settle layout and material flow before the building application.
Plant & material flow (DE) SMEDelicate goods, unusual processes: break the process down, build a functional prototype, test it under real conditions.
Automation & special solutions (DE) Planning firmsWorking in your project team, with client protection and clearly defined work packages.
For planning firms (DE) Institutes & transferFrom research result to a production and logistics concept that works on the shop floor.
For institutes & transfer (DE)The problem
Column grid, gates and floor slab lock in the material flow for decades. If the process is drawn in afterwards, old detours move into the new building.
73 %of variant manufacturers miss their delivery-reliability target, by 21 percentage points on average.Source: Fraunhofer IPA, benchmark of 500 variant manufacturers
≈ 10×is how much more a planning error costs with each project phase, by the rule of thumb.Source: rule of ten, cited in a 2024 dissertation at Saarland University
From practice
Two examples, anonymised until the client agrees to be named.
No slide decks without implementation. No change coaching and no facilitation of change processes among the workforce. Specialists exist for that.
What I do: plan process, layout and material flow so that your architect, your planner and your plant management can work with the result.
About me
I speak the same technical language as your foremen and operators. You work directly with me.
Let us get started
For a smaller, clearly defined first package I can often start the next day. From the start you talk to the engineer who also does the work.







